TM 5-3990-264-13&P
OPERATOR MAINTENANCE
LOADING IBC WITH OR WITHOUT BOAT FROM GROUND
INITIAL SETUP:
Personnel Required
References
(2)
OPERATION
1.
If boat (Figure 1, Item 1) is loaded on IBC (Figure 1, Item 2), ensure that load binder cables (Figure 1, Item
3) (WP 0019) and both front and rear tie-down cables (Figure 1, Item 4) (WP 0020) or both front and rear tie-
down straps (Figure 1, Item 5) (WP 0029) are secured to boat (Figure 1, Item 1).
3
1
4
5
2
Figure 1.
Load Binder and Tie Down Locations.
03/15/2011Rel(1.8)root(opusualwp)wpno(O04001)