• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNLOADING IBC WITH OR WITHOUT BOAT TO GROUND - Continued
Figure 2. Prepare to Launch

Parts Manual For For Cradle, Boat, Improved M14 Page Navigation
  21    22    23    24    25  26  27    28    29    30    31  
img
. . . . .
TM 5-3990-264-13&P
0006
OPERATOR MAINTENANCE
BRIDGE ERECTION BOAT LAUNCHING
INITIAL SETUP:
Equipment Condition
Personnel Required
(3)
IBC with boat on vehicle. (WP 0004)
References
TM 9-2320-435-10 (WP 0042)
TM 9-2320-425-10 (WP 0042)
OPERATION
NOTE
During all launching operations, the operator will drive and be responsible for launching
the boat using the IBC and LHS cab control box. Assistant is the ground guide and will
be responsible for directing and assisting the operator. The operator and the ground guide
will prepare the boat and vehicle for launching and be assisted by the boat crew.
Dashboard parking brake indicator will illuminate when PARKING BRAKE control is
applied.
1.
Pull out PARKING BRAKE control (Figure 1, Item 1).
JACO
BS
ENGIN
1
EBRA
KE
CAUT
ION
XHA
OE   U
ILER Y
TRA PPILG
SU KN
AIR  PARD
FOR  N
NOT MIDLA
US
HTO
Figure 1.
Set Parking Brake.
0006-1
03/15/2011Rel(1.8)root(opusualwp)wpno(O04003)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.