TM 5-3990-264-13&P
0028
INSTALLATION - Continued
1
3
2
3
3
4
4
Figure 4. Roller Installation.
2.
Install two ring pins (Figure 4, Item 1) on two straight pin assemblies (Figure 4, Item 2).
END OF TASK
FOLLOW ON MAINTENANCE
Install bridge erection boat on IBC. (WP 0007)
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M06012)