TM 5-3990-264-13&P
OPERATOR MAINTENANCE
LOADING IBC ON PLS TRAILER IN MANUAL MODE
INITIAL SETUP:
References (cont.)
References
Equipment Condition
OPERATION
WARNING
Check for overhead power lines or other obstructions before attempting LHS operation.
LHS reaches a height of 20 feet (6.1 m) with IBC. Failure to comply may result in serious
injury or death to personnel.
Prior to and during any load or unload cycle, all personnel should stay clear of LHS and
IBC. Failure to comply may result in serious injury or death to personnel.
Trailer wheels must be chocked during transfer operation. Failure to comply may result
in serious injury or death to personnel.
Check ground condition for firmness and extreme sideways inclination before picking up
or off-loading a IBC. Any ground instability beneath tires may result in serious injury or
death to personnel.
CAUTION
Removable skid plate must be installed in stowage position (WP 0018). Failure to comply
may result in damage to equipment.
Ensure trailer drawbar is down against ground during transfer operation. Refer to TM
9-2330-385-10. Failure to comply may result in damage to equipment.
Ensure air lines and cables are properly stowed. Refer to TM 9-2330-385-10. Failure to
comply may result in damage to equipment.
Both trailer bumper points must be under vehicle bumper stop flange and at least one
bumper point must contact bumper stop. Trailer bumper point not contacting vehicle
bumper stop cannot exceed 1/2 inch (12.7 mm) or IBC will miss main rail guides. Failure
to comply may result in damage to equipment.
1.
Back up vehicle so trailer bumper (Figure 1, Item 1) is under flange and contacts vehicle bumper stop (Figure
1, Item 2). Refer to TM 9-2320-435-10 or TM 9-2320-425-10.
0010-1
03/15/2011Rel(1.8)root(opusualwp)wpno(O04007)