• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LOAD BINDER CABLE ASSEMBLY REPLACEMENT
FRONT AND REAR TIE-DOWN CABLE REPLACEMENT

Parts Manual For For Cradle, Boat, Improved M14 Page Navigation
  91    92    93    94    95  96  97    98    99    100    101  
img
.
TM 5-3990-264-13&P
0019
INSTALLATION
NOTE
Both left and right load binder cable assemblies are installed the same way. Left side is shown.
1.
Install chain shackle (Figure 2, Item 4) in loop of load binder (Figure 2, Item 5).
1
5
4
2
6
3
Figure 2. Load Binder Installation.
2.
Install chain shackle (Figure 2, Item 4) to IBC frame (Figure 2, Item 6) with bolt (Figure 2, Item 2) and nut
(Figure 2, Item 3).
3.
Hook eye hook (Figure 2, Item 1) on bridge erection boat.
END OF TASK
END OF WORK PACKAGE
0019-2
03/15/2011Rel(1.8)root(maintwp)wpno(M06003)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.