TM 5-3990-264-13&P
0021
CLEANING
Refer to General Maintenance Instructions (WP 0017) for general cleaning instructions.
END OF TASK
INSPECTION
Refer to General Maintenance Instructions (WP 0017) for general inspection instructions.
END OF TASK
INSTALLATION
NOTE
Both the left and right rubber bumpers are installed the same way. Right side is shown.
Install rubber bumper (Figure 2, Item 3) and retaining plate (Figure 2, Item 4) on cradle frame (Figure 2, Item
5) with three capscrews (Figure 2, Item 1) and lockwashers (Figure 2, Item 2).
5
4
1
2
3
Figure 2.
Bumper Installation.
END OF TASK
FOLLOW ON MAINTENANCE
Install bridge erection boat on IBC. (WP 0007)
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M06005)