TM 5-3990-264-13&P
0022
INSTALLATION
NOTE
All four stanchion pins are installed the same way. Left side is shown.
1.
Position stanchion (Figure 2, Item 7) in stanchion pocket (Figure 2, Item 8) and align holes.
2.
Install headless straight pin (Figure 2, Item 6) and secure with ring pin (Figure 2, Item 5).
3.
Position wire rope (Figure 2, Item 3) on cradle frame (Figure 2, Item 4) and secure with flat washer (Figure 2,
Item 2) and self-tapping screw (Figure 2, Item 1).
END OF TASK
FOLLOW ON MAINTENANCE
Install bridge erection boat on IBC. (WP 0007)
END OF TASK
END OF WORK PACKAGE
0022-3/4 blank
03/15/2011Rel(1.8)root(maintwp)wpno(M06006)